• +7(495) 780-72-96

01.02.2018

Moscow Translation Agency has started translating for Arctic LNG-2 project.
This work includes translation of tender and technical documentation on design and construction of offshore gravity-based structures for natural gas liquefaction, as well as translation of drawings.
As of now, the total volume of translation has exceeded 6,000 pages.
Arctic LNG-2 project is planned for implementation on the base of the Utrenneye field located on the Gydan Peninsula. The launch of the first line is scheduled for 2022-2023.